Transparent preliminary screen
Commercial Solar Feasibility Screener
Our quick screen for business premises. Enter your roof area and consumption, and if the result looks promising, send it to us for a full assessment.
Enough for a useful first screen
Indicative capacity ceiling: about 193 kWp
This is the lower of a roof-density screen and a consumption-led screen, rounded to the nearest whole kWp. It is not a recommended system size.
- Roof-density ceiling
- about 250 kWp
- Consumption-led ceiling
- about 193 kWp
- Controlling constraint
- Daytime consumption
- Region (not used in calculation)
- Mainland Spain
- Operating days (not used in calculation)
- 6 days per week
- Battery interest (not used in calculation)
- Unsure
What must be checked next
- Half-hourly or hourly consumption data and tariff periods
- Roof structure, usable zones, shading, fire access and equipment loads
- Electrical single-line diagram, contracted power and connection point
- Export route, applicable permissions and autonomous-community procedure
Assumptions: 6 m² per kWp as a coarse roof-density allowance, daytime consumption equals annual consumption multiplied by the stated daytime share, and 1,450 kWh/kWp is used as a neutral annual-yield screen. Region, operating days and battery interest are recorded for context but do not alter this calculation. Real yield varies materially by location, orientation, shading, equipment and losses. This preliminary screen is not a quotation, system design, savings guarantee or recommended system size.
Take the screen to assessment ↗Understand the output
Capacity is constrained by both place and demand.
A roof may physically accommodate more modules than the business can use economically. Conversely, a high daytime load does not create usable roof area or a viable connection.
Read how system sizing follows consumption and what a feasibility study must check.
How we use the screen
The screener gives the upper limit for a first conversation, not a system size. It takes the lower of two ceilings: what the roof could physically hold at a coarse 6 m² per kWp, and what your daytime consumption could absorb at a neutral yield of 1,450 kWh per kWp a year. Whichever is lower is the constraint we look at first.
If the roof is the constraint, we look at whether more usable area exists: other buildings on the site, a car park that could take solar carports, or ground space. If consumption is the constraint, a larger system would mostly export, so we look at the tariff periods, planned loads such as heat pumps or vehicle charging, and whether battery storage would let you use more of the output.
What we need next
Send us the result with twelve months of bills or, better, your interval consumption from Datadis. From that we model your site hour by hour with the real yield for your location, which can range from about 1,150 kWh per kWp a year in the north to more than 1,600 in the south, and tell you whether a survey is worthwhile. The first review is free.
