We assess, design and install commercial rooftop solar for businesses across mainland Spain and the Balearic Islands, from small units to systems above 100 kW. Every system is sized from when your business uses electricity, and one team takes it from the first survey to handover.
We work on warehouses and factories, hotels, supermarkets and retail, offices and business parks, cold storage and farms and food producers. The full list is on our industries page.
Request a commercial solar assessment
Which businesses suit solar
What matters more than the sector is the shape of demand. A building that uses electricity steadily through daylight uses most of what it generates; one whose demand falls early or late in the day exports more. That difference, not the size of the roof, usually decides whether a project is worth doing. Larger sites are covered on our large systems page and industrial buildings under industrial and warehouse solar.
Why timing decides the design
Solar pays when the business uses the electricity as it is produced. Output you cannot use is exported at a lower value or, on a zero-export system, curtailed and lost. That is why sizing from the roof or the annual bill so often gets it wrong: neither shows when you use power.
Spanish business tariffs add a second layer. The year is split into six price periods, and weekends fall entirely in the cheapest one, so a five-day business produces much of its surplus when it is worth least. We size every system by overlaying a year of modelled output on your interval data, as our guide to sizing around business electricity use explains.
What our assessment covers
The site: usable roof area, orientation, shading, roof condition and remaining life, structure, and access for the works.

The electrics: connection voltage, switchboard capacity, connection point, cable routes, metering, and whether export must be limited.
Output against demand: hourly output for your roof against your consumption, split into electricity used on site, exported and curtailed, for two or three system sizes.
The paperwork: with or without surplus, grid access, the town hall's procedure and the regional registration, which vary by location, as our permissions guide explains.
What our proposals show
Panel capacity in kWp and inverter capacity in kW, stated separately. Exact equipment models. The inputs to the output model, so the figure can be checked. Self-consumed, exported and curtailed electricity as three separate figures, each valued correctly, because applying one price to all of it overstates the saving. Then the cost with and without IVA, a written list of exclusions, who handles each procedure, the programme, payment stages and the warranties.
Cost and return
Cost per kWp usually falls as systems grow, but roof condition, access, cable runs and structural or electrical work can outweigh that. The return depends on how much output you use on site, the price of the electricity it replaces, how surplus is treated and the finance and maintenance assumptions. Our guides to commercial solar costs and payback and return show the method with every assumption visible.
From enquiry to handover
You send us the basics and we review them. We talk through the site, and if you want to go ahead we survey it and issue a proposal with the capacity options, costs, exclusions and programme. Once you sign, we handle the town hall, distributor and regional procedures, install, test, legalise and hand over the documents. Each procedure and who is responsible for it is set out in the proposal before you commit.

Most of the time in a project goes on surveys, engineering, procurement and procedures; the installation itself is the shorter part. We give you a provisional programme once the regulatory route for your site is known.
One team, one point of contact
The team that surveys your site installs it, and you deal with one contact from first review to handover. The first review is free and commits you to nothing. We also encourage you to compare our proposal with others, using our guide to comparing commercial solar quotes.
Frequently asked questions
Who carries out the installation? We do. Our team handles the assessment, design, installation and commissioning across mainland Spain and the Balearic Islands.
What if we lease the building? It is still possible. The landlord must consent to works on the roof, and the remaining lease must be long enough to recover the cost, so raise it at the start.
Does the business still buy electricity from the grid? Yes. Solar supplies part of the demand in daylight, and the grid covers the rest, at night and whenever demand exceeds output.
What happens above 100 kW? Simplified surplus compensation no longer applies and other arrangements come in, as our guide to solar above 100 kW explains.